It’s great to
        live in Dorval!

It’s great to
        live in Dorval!

NEWS

Beginning of the Reconstruction Work of Highway 520 Overpass Bridges, Above 43rd Avenue, as of April 22

Published on 04-17-2024

The ministère des Transports et de la Mobilité durable wishes to inform motorists that the reconstruction work of Highway 520 (Côte-de-Liesse) overpass bridges, above 43rd Avenue, will begin on April 22 and will continue until the end of 2025.

The work will be undertaken in two phases:

  • 2024: Reconstruction of the service roads’ overpass bridges (Côte-de-Liesse Road) in both directions
  • 2025: Reconstruction of the highway’s overpass bridges

Traffic disruptions
As of April 22 and until the end of 2024

  • Complete closure of 43rd Avenue, between Ryan Avenue and Joseph-Dubreuil Road
  • Complete closure of Ryan Avenue, between 43rd Avenue and Renaud Avenue
  • Complete closure of Joseph-Dubreuil Road, between 43rd Avenue and 46th Avenue
  • Complete closure of the access ramp from 43rd Avenue to the eastbound Highway 520 service road
  • Local traffic will be maintained during this work

As of April 22, for approximately 3 weeks

  • Closure of the right lanes on Highway 520 in both directions
  • Closure of the left lanes on the Highway 520 service roads in both directions

Other traffic disruptions will be required to carry out this project, namely the closure of the Highway 520 service roads in both directions. The dates and details regarding this disruption will be announced as soon as possible.

Free shuttle service

  • 43rd Avenue will be closed until the end of 2024 to all vehicles and pedestrians, between Ryan Avenue and Joseph-Dubreuil Road. A free shuttle service will therefore be offered 24/7 to allow pedestrians and cyclists to cross the highway near 43rd Avenue.
  • The shuttles’ stop points will be located:
    • On 52nd Avenue, near the eastbound Highway 520 service road
    • On 32nd Avenue, near the eastbound Highway 520 service road
    • At the intersection of Ryan and Riddle avenues
    • On Jean-Paul Laframboise Road, near the westbound Highway 520 service road

Motorists will be invited to take the identified detours. In case of poor weather conditions or operational constraints, this closing could be postponed.

<p>Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>Sister Ona B. Bessette, leader and Superior General of the Congrégation, and Chantale Bilodeau, Director of Public Affairs and City Clerk for the City of Dorval</p>
<p>Sister Ona B. Bessette, leader and Superior General of the Congrégation, and Francine Pager, notary</p>
<p>Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>From left to right: Robert Bourbeau, Director General of the City of Dorval; Suzie Prince, Executive Director of the financial administration ofthe Congrégation de Notre-Dame; Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation; Chantale Bilodeau, Director of Public Affairs and City Clerk for the City of Dorval; Francine Pager, notary; Louiza Sadoun, Assistant City Clerk; Carl Minville, Director of the City of Dorval's Public Works</p>
Archives - 2022
Archives - 2022
Archives - 2021
Archives - 2021
Archives - 2020
Archives - 2020
Archives - 2019
Archives - 2019
Archives - 2018
Archives - 2018
Archives - 2017
Archives - 2017
Archives - 2016
Archives - 2016
Archives - 2015
Archives - 2015
NEWS

Beginning of the Reconstruction Work of Highway 520 Overpass Bridges, Above 43rd Avenue, as of April 22

Published on 04-17-2024

The ministère des Transports et de la Mobilité durable wishes to inform motorists that the reconstruction work of Highway 520 (Côte-de-Liesse) overpass bridges, above 43rd Avenue, will begin on April 22 and will continue until the end of 2025.

The work will be undertaken in two phases:

  • 2024: Reconstruction of the service roads’ overpass bridges (Côte-de-Liesse Road) in both directions
  • 2025: Reconstruction of the highway’s overpass bridges

Traffic disruptions
As of April 22 and until the end of 2024

  • Complete closure of 43rd Avenue, between Ryan Avenue and Joseph-Dubreuil Road
  • Complete closure of Ryan Avenue, between 43rd Avenue and Renaud Avenue
  • Complete closure of Joseph-Dubreuil Road, between 43rd Avenue and 46th Avenue
  • Complete closure of the access ramp from 43rd Avenue to the eastbound Highway 520 service road
  • Local traffic will be maintained during this work

As of April 22, for approximately 3 weeks

  • Closure of the right lanes on Highway 520 in both directions
  • Closure of the left lanes on the Highway 520 service roads in both directions

Other traffic disruptions will be required to carry out this project, namely the closure of the Highway 520 service roads in both directions. The dates and details regarding this disruption will be announced as soon as possible.

Free shuttle service

  • 43rd Avenue will be closed until the end of 2024 to all vehicles and pedestrians, between Ryan Avenue and Joseph-Dubreuil Road. A free shuttle service will therefore be offered 24/7 to allow pedestrians and cyclists to cross the highway near 43rd Avenue.
  • The shuttles’ stop points will be located:
    • On 52nd Avenue, near the eastbound Highway 520 service road
    • On 32nd Avenue, near the eastbound Highway 520 service road
    • At the intersection of Ryan and Riddle avenues
    • On Jean-Paul Laframboise Road, near the westbound Highway 520 service road

Motorists will be invited to take the identified detours. In case of poor weather conditions or operational constraints, this closing could be postponed.

<p>Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>Sister Ona B. Bessette, leader and Superior General of the Congrégation, and Chantale Bilodeau, Director of Public Affairs and City Clerk for the City of Dorval</p>
<p>Sister Ona B. Bessette, leader and Superior General of the Congrégation, and Francine Pager, notary</p>
<p>Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>From left to right: Robert Bourbeau, Director General of the City of Dorval; Suzie Prince, Executive Director of the financial administration ofthe Congrégation de Notre-Dame; Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation; Chantale Bilodeau, Director of Public Affairs and City Clerk for the City of Dorval; Francine Pager, notary; Louiza Sadoun, Assistant City Clerk; Carl Minville, Director of the City of Dorval's Public Works</p>
Archives - 2022
Archives - 2022
Archives - 2021
Archives - 2021
Archives - 2020
Archives - 2020
Archives - 2019
Archives - 2019
Archives - 2018
Archives - 2018
Archives - 2017
Archives - 2017
Archives - 2016
Archives - 2016
Archives - 2015
Archives - 2015

Beginning of the Reconstruction Work of Highway 520 Overpass Bridges, Above 43rd Avenue, as of April 22

Published on 04-17-2024

The ministère des Transports et de la Mobilité durable wishes to inform motorists that the reconstruction work of Highway 520 (Côte-de-Liesse) overpass bridges, above 43rd Avenue, will begin on April 22 and will continue until the end of 2025.

The work will be undertaken in two phases:

  • 2024: Reconstruction of the service roads’ overpass bridges (Côte-de-Liesse Road) in both directions
  • 2025: Reconstruction of the highway’s overpass bridges

Traffic disruptions
As of April 22 and until the end of 2024

  • Complete closure of 43rd Avenue, between Ryan Avenue and Joseph-Dubreuil Road
  • Complete closure of Ryan Avenue, between 43rd Avenue and Renaud Avenue
  • Complete closure of Joseph-Dubreuil Road, between 43rd Avenue and 46th Avenue
  • Complete closure of the access ramp from 43rd Avenue to the eastbound Highway 520 service road
  • Local traffic will be maintained during this work

As of April 22, for approximately 3 weeks

  • Closure of the right lanes on Highway 520 in both directions
  • Closure of the left lanes on the Highway 520 service roads in both directions

Other traffic disruptions will be required to carry out this project, namely the closure of the Highway 520 service roads in both directions. The dates and details regarding this disruption will be announced as soon as possible.

Free shuttle service

  • 43rd Avenue will be closed until the end of 2024 to all vehicles and pedestrians, between Ryan Avenue and Joseph-Dubreuil Road. A free shuttle service will therefore be offered 24/7 to allow pedestrians and cyclists to cross the highway near 43rd Avenue.
  • The shuttles’ stop points will be located:
    • On 52nd Avenue, near the eastbound Highway 520 service road
    • On 32nd Avenue, near the eastbound Highway 520 service road
    • At the intersection of Ryan and Riddle avenues
    • On Jean-Paul Laframboise Road, near the westbound Highway 520 service road

Motorists will be invited to take the identified detours. In case of poor weather conditions or operational constraints, this closing could be postponed.

<p>Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>Sister Ona B. Bessette, leader and Superior General of the Congrégation, and Chantale Bilodeau, Director of Public Affairs and City Clerk for the City of Dorval</p>
<p>Sister Ona B. Bessette, leader and Superior General of the Congrégation, and Francine Pager, notary</p>
<p>Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation</p>
<p>From left to right: Robert Bourbeau, Director General of the City of Dorval; Suzie Prince, Executive Director of the financial administration ofthe Congrégation de Notre-Dame; Marc Doret, Mayor of the City of Dorval; Sister Ona B. Bessette, leader and Superior General of the Congrégation; Chantale Bilodeau, Director of Public Affairs and City Clerk for the City of Dorval; Francine Pager, notary; Louiza Sadoun, Assistant City Clerk; Carl Minville, Director of the City of Dorval's Public Works</p>
Archives - 2022
Archives - 2022
Archives - 2021
Archives - 2021
Archives - 2020
Archives - 2020
Archives - 2019
Archives - 2019
Archives - 2018
Archives - 2018
Archives - 2017
Archives - 2017
Archives - 2016
Archives - 2016
Archives - 2015
Archives - 2015
 © Copyright 2017 City of Dorval – All rights reserved

This website may not display correctly in Internet Explorer.
We recommend using a compatible browser such as Firefox or Chrome.
Top